Design Review and Construction Supervision of AL FASHIR -NYALA ROAD Project (Total Length 215 Km)
Completion date: 2014
(Darfur State) |
|
|
|
|
|
|
|
|
Description of the Project: |
|
|
Construction of 115 Km (from Km 95+000 to Km 190+000) and overlay works for 110 Km; connecting Al Fasher (South Darfur) and Nyala (North Darfur); the work included construction of (4) steel and concrete bridges. |
|
|
|
|
|
|
|
|
------- |
|
|
Design Review and Construction Supervision of NYALA - ZALIGEI ROAD Project (Total Length 205 Km)
Completion Date: Oct. 2014
(North Darfur State) |
|
|
|
|
|
|
|
|
Description of the Project: |
|
|
Overlay and rehabilitation works for 215 Km for the rod connecting Nyala, Kas and Zalingei. The project is an extension of Al Fasher Nyala road. |
|
|
|
|
|
|
|
|
------- |
|
|
KARAKON - HAMASHKORAIB ROAD Project - 2012
(Kassala State) |
|
|
|
|
|
|
|
|
|
|
|
Description of the Project: |
|
|
Construction of all-weather asphaltic road connecting Karakon and Hamashkoraib, with total length of 50 Km. The project included construction of (4) concrete and steel bridges. |
|
|
|
|
|
|
|
|
------- |
|
|
Construction Supervision of EL MAIRAM - EL MOGLAD ROAD Project (Total Length 20 Km) - 2011
(South Kordofan State) |
|
|
|
|
|
|
|
|
Description of the Project: |
|
|
Construction of the asphaltic road (20 Km), connecting El Mairam and El Moglad, from Km 167+000 to Km 187+000 (Section-2), through El Heraika and El Rogrog. The road was extension of Aweel El Mairam Road. |
|
|
|
|
|
|
|
|
------- |
|
|
Design Review and Construction Supervision of ELMAIRAM - AWEEL ROAD Project.(Total Length 110 Km) - 2011
(North Kordofan State) |
|
|
|
|
|
|
|
|
Description of the Project: |
|
|
The project entailed upgrading of existing gravel road to all-weather asphaltic road connecting El Mairam & Aweel. The total length of the road was 165 Km. The construction of the road was assigned to three contractors: (i) Danfodio (Km 0+000 to Km 55+000), (ii) Bashaier (Km 55+000 to Km 110+000) and (iii) Zadna (Km 110+000 to Km 165+000). |
|
|
|
|
|
|
|
|
------- |
|
|
Construction Supervision of DEGAIN - WAGAR ROAD Project (Total Length 50 Km.) - 2011
(Kassala State) |
|
|
|
|
|
|
|
|
Description of the Project: |
|
|
Construction of all-weather asphaltic road connecting Degain and Wagar, with total length of 50 Km. The road was an extension of Kassala - Degain road. |
|
|
|
|
|
|
|
|
------- |
|
|
Construction Supervision of KASSALA - DEGAIN ROAD Project (Total Length 50 Km.) - 2009
(Kassala State) |
|
|
|
|
|
|
|
|
Description of the Project: |
|
|
Construction of all-weather asphaltic road connecting Kassala
and Degain, with total length of 50 Km. The project included
construction of Karakon steel bridge across Gash River (3-spans,
180 mL). |
|
|
|
|
|
|
|
|
------- |
|
|
Engineering Study and Detailed Design of KASSALA - WAGAR ROAD Project (Total Length 100 Km.) - 2004
(Kassala State) |
|
|
|
|
|
|
|
|
Description of the Project: |
|
|
Engineering study and detailed design for the road connecting Kassala, Degain, and Wagar. The total length of the road is 100 km. |
|
|
|
|
|
|
|
|
--------------- |
|
|
|
|
|